West Gate Bridge Strengthening Project - Strengthening of the Main Cable Stayed Bridge
|
Bibliographic Details
Author(s): |
Chris Murphy
Robert Percy Alan Platt |
||||
---|---|---|---|---|---|
Medium: | conference paper | ||||
Language(s): | English | ||||
Conference: | 18th IABSE Congress: Innovative Infrastructures – Towards Human Urbanism, Seoul, Korea, 19-21 September 2012 | ||||
Published in: | IABSE Congress Seoul 2012 | ||||
|
|||||
Page(s): | 879-886 | ||||
Total no. of pages: | 8 | ||||
DOI: | 10.2749/222137912805111294 | ||||
Abstract: |
This paper describes the structural assessment work carried out by the West Gate Bridge Strengthening Alliance ("WGBSA") on the West Gate cable-stayed spans in devising the necessary strengthening measures, the approaches adopted to optimise the strengthening and the various challenges faced by the construction team to implement the strengthening. |
||||
Keywords: |
box girder bridges Cable stayed bridges steel bridge strengthening
|