West Gate Bridge Strengthening Project - Strengthening of the Main Cable Stayed Bridge
|
Détails bibliographiques
Auteur(s): |
Chris Murphy
Robert Percy Alan Platt |
||||
---|---|---|---|---|---|
Médium: | papier de conférence | ||||
Langue(s): | anglais | ||||
Conférence: | 18th IABSE Congress: Innovative Infrastructures – Towards Human Urbanism, Seoul, Korea, 19-21 September 2012 | ||||
Publié dans: | IABSE Congress Seoul 2012 | ||||
|
|||||
Page(s): | 879-886 | ||||
Nombre total de pages (du PDF): | 8 | ||||
DOI: | 10.2749/222137912805111294 | ||||
Abstrait: |
This paper describes the structural assessment work carried out by the West Gate Bridge Strengthening Alliance ("WGBSA") on the West Gate cable-stayed spans in devising the necessary strengthening measures, the approaches adopted to optimise the strengthening and the various challenges faced by the construction team to implement the strengthening. |
||||
Mots-clé: |
Ponts en poutre-caisson
|