Viaduct in the Highway Siervo de la Nación
Author(s): |
Carlos Santos
(University of Minho, Guimarães, Portugal)
José Matos (University of Minho, Guimarães, Portugal) José Luís Barbosa (GEG- Engineering Structures for Life, Porto, Portugal) Ricardo Leite (GEG- Engineering Structures for Life, Porto, Portugal) |
---|---|
Medium: | conference paper |
Language(s): | English |
Conference: | IABSE Conference: Engineering the Developing World, Kuala Lumpur, Malaysia, 25-27 April 2018 |
Published in: | IABSE Conference Kuala Lumpur 2018 |
Page(s): | 338-339 |
DOI: | 10.2749/kualalumpur.2018.0338 |
Abstract: |
The aim of this paper is to present a real case study regarding the long multi-span viaducts. Briefly, the authors show the global structural concept used in Mexico City´s long viaduct to ensure a good behavior to accommodate differential settlements that can occur. It is important to highlight that the design was developed by GEG. |
Keywords: |
design structural concept precast long multi-span viaduct
|
Download preview file (PDF)
0.14 MB
Advertisement
Advertisement
0.14 MB
- About this
data sheet - Reference-ID
10562634 - Published on:
14/02/2021 - Last updated on:
21/05/2021