0
  • DE
  • EN
  • FR
  • International Database and Gallery of Structures

Advertisement

ViA15 (A12/A15 | Arnhem | Netherlands): Design and structural behaviour analysis of a balanced cantilever bridge with a below suspended bicycle and pedestrian bridge

 ViA15 (A12/A15 | Arnhem | Netherlands): Design and structural behaviour analysis of a balanced cantilever bridge with a below suspended bicycle and pedestrian bridge
Author(s): , ,
Presented at IABSE Symposium: Challenges for Existing and Oncoming Structures, Prague, Czech Republic, 25-27 May 2022, published in , pp. 1000-1007
DOI: 10.2749/prague.2022.1000
Price: € 25.00 incl. VAT for PDF document  
ADD TO CART
Download preview file (PDF) 0.14 MB

In order to complete the connection between the A15 and A12 highways in the Dutch region Gelderland, a bridge over the river ‘Pannerdensch Kanaal’ will be constructed. The main bridge is erected us...
Read more

Bibliographic Details

Author(s): (HOCHTIEF Engineering GmbH, Essen, Germany)
(NEY & Partners, Brussels, Belgium)
(HOCHTIEF Infrastructure, Amstelveen, Netherlands)
Medium: conference paper
Language(s): English
Conference: IABSE Symposium: Challenges for Existing and Oncoming Structures, Prague, Czech Republic, 25-27 May 2022
Published in:
Page(s): 1000-1007 Total no. of pages: 8
Page(s): 1000-1007
Total no. of pages: 8
DOI: 10.2749/prague.2022.1000
Abstract:

In order to complete the connection between the A15 and A12 highways in the Dutch region Gelderland, a bridge over the river ‘Pannerdensch Kanaal’ will be constructed. The main bridge is erected using the balanced cantilever construction method and designed as a continuous three- span box girder with varying height at a total length of 340 m. The superstructure consists of a longitudinally and transversally post-tensioned concrete deck with a maximum span length of 170 m and an approximate width of 28 m. Furthermore, the structure contains a bicycle and a pedestrian steel bridge, which are suspended below/beside the deck, allowing cyclists and pedestrians to cross the river and the Natura 2000 protected area. Additionally the bridge complex integrates ecological demands, such as swallow nests and bat roosts.

Keywords:
spherical bearings post-tensioning cantilever construction ViA15 Arnhem|Netherlands Rijkswaterstaat GelreGroen material technology architectural shape ecological demands
Copyright: © 2022 International Association for Bridge and Structural Engineering (IABSE)
License:

This creative work is copyrighted material and may not be used without explicit approval by the author and/or copyright owner.