Tappan Zee Hudson River Crossing: The New NY Bridge Project
|
Bibliographic Details
Author(s): |
Marco Rosignoli
|
||||
---|---|---|---|---|---|
Medium: | conference paper | ||||
Language(s): | English | ||||
Conference: | IABSE Symposium: Engineering for Progress, Nature and People, Madrid, Spain, 3-5 September 2014 | ||||
Published in: | IABSE Symposium Madrid 2014 | ||||
|
|||||
Page(s): | 1932-1939 | ||||
Total no. of pages: | 8 | ||||
Year: | 2014 | ||||
DOI: | 10.2749/222137814814068418 | ||||
Abstract: |
The Tappan Zee Hudson River Crossing – the New NY Bridge Project – is a great example of how the design-build method of project delivery can lead to innovative and cost-effective design solutions. The design-build team worked together during the bid phase to develop the design of an iconic bridge for the New York area that is cost-effective to build, operate and maintain. The bridge has been designed to provide a 100-year service life prior to major maintenance. |
||||
Keywords: |
cable-stayed bridges incremental launching composite construction design-build Large-Scale Projects prefabricated pile-caps prefabricated pier-caps full-depth precast deck panels
|