Stress redistribution in bridges built using the balanced lift method

 Stress redistribution in bridges built using the balanced lift method
Author(s): ,
Presented at IABSE Conference: Elegance in structures, Nara, Japan, 13-15 May 2015, published in , pp. 126-127
DOI: 10.2749/222137815815774223
Price: € 25.00 incl. VAT for PDF document  
ADD TO CART
Download preview file (PDF) 0.61 MB

The balanced lift method for bridge construction was developed at Vienna University of Technology. This method proposes to build the bridge girders in a vertical position and to rotate them into th...
Read more

Bibliographic Details

Author(s):

Medium: conference paper
Language(s): English
Conference: IABSE Conference: Elegance in structures, Nara, Japan, 13-15 May 2015
Published in:
Page(s): 126-127 Total no. of pages: 6
Page(s): 126-127
Total no. of pages: 6
Year: 2015
DOI: 10.2749/222137815815774223
Abstract:

The balanced lift method for bridge construction was developed at Vienna University of Technology. This method proposes to build the bridge girders in a vertical position and to rotate them into the final horizontal position with the aid of compression struts.

During the construction process, when the bridge girders are rotated from the initial vertical position into the final horizontal position, it is of utmost importance for an economic application of the balanced lift method that the structural members are as light as possible. It was therefore suggested to produce the bridge girders and the compression struts using thin prefabricated plate elements. The bridge girders have to be presstressed in order to resist the stresses occurring during transport, handling and mounting. Additional prestressing has to be applied before these thin-walled hollow elements are filled with in-situ concrete. High compressive stresses of up to 30N/mm² exist in the precast bridge girders prior to the filling with concrete.

In the course of research project a 30m long test beam was built to experimentally prove the applicability of such a construction procedure. It could be shown in the experiment and also in concurrent numerical analyses that stress redistribution between the highly stressed prefabricated girder and the filler concrete occurs. Considerable economic advantages can be achieved by taking these stress redistribution into account in the final design of bridges designed according to the balanced lift method.

Keywords:
bridge balanced lift method innovation building stages deep valley