0
  • DE
  • EN
  • FR
  • International Database and Gallery of Structures

Advertisement

Strengthening Paudèze bridges decks using UHPFRC struts

 Strengthening Paudèze bridges decks using UHPFRC struts
Author(s): , ,
Presented at IABSE Congress: The Evolving Metropolis, New York, NY, USA, 4-6 September 2019, published in , pp. 1469-1475
DOI: 10.2749/newyork.2019.1469
Price: € 25.00 incl. VAT for PDF document  
ADD TO CART
Download preview file (PDF) 0.19 MB

Paudèze bridges are two 400‐m long parallel highway bridges located in Switzerland and opened to traffic in 1974. After over 40 years of service life, both bridges must be completely rehabilitated ...
Read more

Bibliographic Details

Author(s): (INGPHI SA)
(INGPHI SA)
(INGPHI SA)
Medium: conference paper
Language(s): English
Conference: IABSE Congress: The Evolving Metropolis, New York, NY, USA, 4-6 September 2019
Published in:
Page(s): 1469-1475 Total no. of pages: 7
Page(s): 1469-1475
Total no. of pages: 7
DOI: 10.2749/newyork.2019.1469
Abstract:

Paudèze bridges are two 400‐m long parallel highway bridges located in Switzerland and opened to traffic in 1974. After over 40 years of service life, both bridges must be completely rehabilitated and strengthened while constantly maintaining 2 traffic lanes in both directions.

The bridge deck slab was strengthened using UHPFRC (Ultra‐High Performance Fiber Reinforced Concrete) struts. These inclined struts connect the end of the deck slab cantilever and the box girder web, forming a Warren truss. They thus reduce the bending moments in the deck slab and the existing steel reinforcement could be kept.

The joint between the prefabricated UHPFRC struts and the existing concrete web is done through a cast in‐ place UHPFRC beam, without any mechanical connection. Forces go through the joint and into the web by a combination of friction and compression forces.

Various experimental tests and numerical simulations confirmed the feasibility of this solution. In particular, the UHPFRC‐concrete web connection, the UHPFRC‐UHPFRC connection and the global behavior of the strut were tested and modelled.

The strengthening of the bridges decks took place between 2017 and 2019. The developed solution, using UHPFRC struts, was shown to be very effective to strengthen the deck and creates a rhythm in the structure.

Keywords:
bridge strengthening rehabilitation struts UHPFRC

Structures and Projects