Strengthening Paudèze bridges decks using UHPFRC struts
|
Bibliografische Angaben
Autor(en): |
Philippe Menétrey
(INGPHI SA)
Lionel Moreillon (INGPHI SA) Maléna Bastien-Masse (INGPHI SA) |
||||
---|---|---|---|---|---|
Medium: | Tagungsbeitrag | ||||
Sprache(n): | Englisch | ||||
Tagung: | IABSE Congress: The Evolving Metropolis, New York, NY, USA, 4-6 September 2019 | ||||
Veröffentlicht in: | The Evolving Metropolis | ||||
|
|||||
Seite(n): | 1469-1475 | ||||
Anzahl der Seiten (im PDF): | 7 | ||||
DOI: | 10.2749/newyork.2019.1469 | ||||
Abstrakt: |
Paudèze bridges are two 400‐m long parallel highway bridges located in Switzerland and opened to traffic in 1974. After over 40 years of service life, both bridges must be completely rehabilitated and strengthened while constantly maintaining 2 traffic lanes in both directions. The bridge deck slab was strengthened using UHPFRC (Ultra‐High Performance Fiber Reinforced Concrete) struts. These inclined struts connect the end of the deck slab cantilever and the box girder web, forming a Warren truss. They thus reduce the bending moments in the deck slab and the existing steel reinforcement could be kept. The joint between the prefabricated UHPFRC struts and the existing concrete web is done through a cast in‐ place UHPFRC beam, without any mechanical connection. Forces go through the joint and into the web by a combination of friction and compression forces. Various experimental tests and numerical simulations confirmed the feasibility of this solution. In particular, the UHPFRC‐concrete web connection, the UHPFRC‐UHPFRC connection and the global behavior of the strut were tested and modelled. The strengthening of the bridges decks took place between 2017 and 2019. The developed solution, using UHPFRC struts, was shown to be very effective to strengthen the deck and creates a rhythm in the structure. |
||||
Stichwörter: |
Brücke Verstärkung Instandsetzung UHPFRC
|