The replacement of the Uusi-Pitkälä underpass bridge
|
Bibliographic Details
Author(s): |
Sami Noponen
(Sweco Structures Ltd, Helsinki, Finland)
|
||||
---|---|---|---|---|---|
Medium: | conference paper | ||||
Language(s): | English | ||||
Conference: | IABSE Congress: Resilient technologies for sustainable infrastructure, Christchurch, New Zealand, 3-5 February 2021 | ||||
Published in: | IABSE Congress Christchurch 2020 | ||||
|
|||||
Page(s): | 576-580 | ||||
Total no. of pages: | 5 | ||||
DOI: | 10.2749/christchurch.2021.0576 | ||||
Abstract: |
The goal of this paper is to present an example of the Finnish construction and designing methods of railway bridges on existing railway lines. |
||||
Keywords: |
bridge railroad post-tensioning construction method
|