The replacement of the Uusi-Pitkälä underpass bridge
|
Détails bibliographiques
Auteur(s): |
Sami Noponen
(Sweco Structures Ltd, Helsinki, Finland)
|
||||
---|---|---|---|---|---|
Médium: | papier de conférence | ||||
Langue(s): | anglais | ||||
Conférence: | IABSE Congress: Resilient technologies for sustainable infrastructure, Christchurch, New Zealand, 3-5 February 2021 | ||||
Publié dans: | IABSE Congress Christchurch 2020 | ||||
|
|||||
Page(s): | 576-580 | ||||
Nombre total de pages (du PDF): | 5 | ||||
DOI: | 10.2749/christchurch.2021.0576 | ||||
Abstrait: |
The goal of this paper is to present an example of the Finnish construction and designing methods of railway bridges on existing railway lines. |
||||
Mots-clé: |
pont
|