Replacement of the Cable Stays at Ewijk Bridge, the Netherlands
|
Bibliographic Details
Author(s): |
Conor Lavery
Pat Moore Edo Vonk Gerland Nagtegaal |
||||
---|---|---|---|---|---|
Medium: | conference paper | ||||
Language(s): | English | ||||
Conference: | IABSE Conference: Assessment, Upgrading and Refurbishment of Infrastructures, Rotterdam, The Netherlands, 6-8 May 2013 | ||||
Published in: | IABSE Conference, Rotterdam, May 2013 | ||||
|
|||||
Page(s): | 562-563 | ||||
Total no. of pages: | 8 | ||||
Year: | 2013 | ||||
DOI: | 10.2749/222137813806548433 | ||||
Abstract: |
Managing Contractor has carried out the design of the replacement of the existing cables stays at Ewijk Bridge. Replacement of the existing cables is one component of the renovation works necessary to extend the design life of this large steel bridge by at least 30 years. |
||||
Keywords: |
refurbishment steel bridges orthotropic bridge deck strengthening assessment steel box girder cable stay jacking locked coil cables
|