Replacement of the Cable Stays at Ewijk Bridge, the Netherlands
|
Détails bibliographiques
Auteur(s): |
Conor Lavery
Pat Moore Edo Vonk Gerland Nagtegaal |
||||
---|---|---|---|---|---|
Médium: | papier de conférence | ||||
Langue(s): | anglais | ||||
Conférence: | IABSE Conference: Assessment, Upgrading and Refurbishment of Infrastructures, Rotterdam, The Netherlands, 6-8 May 2013 | ||||
Publié dans: | IABSE Conference, Rotterdam, May 2013 | ||||
|
|||||
Page(s): | 562-563 | ||||
Nombre total de pages (du PDF): | 8 | ||||
Année: | 2013 | ||||
DOI: | 10.2749/222137813806548433 | ||||
Abstrait: |
Managing Contractor has carried out the design of the replacement of the existing cables stays at Ewijk Bridge. Replacement of the existing cables is one component of the renovation works necessary to extend the design life of this large steel bridge by at least 30 years. |
||||
Mots-clé: |
ponts en acier renforcement
|