Edo Vonk
- (2023): Load transfer of stay cable forces to pylon, design criteria and comparison of solutions. Présenté pendant: IABSE Symposium: Long Span Bridges, Istanbul, Turkey, 26-28 April 2023.
- (2019): Cable Replacement in North America. Présenté pendant: IABSE Congress: The Evolving Metropolis, New York, NY, USA, 4-6 September 2019.
- Innovative Approaches to Steel Bridge Repair and Strengthening Around the Globe. Dans: Structural Engineering International, v. 29, n. 4 (octobre 2019). (2019):
- (2013): Renovation design of the Bridge at Ewijk in The Netherlands. Présenté pendant: IABSE Conference: Assessment, Upgrading and Refurbishment of Infrastructures, Rotterdam, The Netherlands, 6-8 May 2013.
- (2013): Crack growth prediction of deck plate-stiffener joints in orthotropic steel bridge decks. Présenté pendant: IABSE Conference: Assessment, Upgrading and Refurbishment of Infrastructures, Rotterdam, The Netherlands, 6-8 May 2013.
- (2013): Replacement of the Cable Stays at Ewijk Bridge, the Netherlands. Présenté pendant: IABSE Conference: Assessment, Upgrading and Refurbishment of Infrastructures, Rotterdam, The Netherlands, 6-8 May 2013.
- (2014): Prefabricated UHPFRC Slabs as a Strengthening Alternative for Ewijk Bridge. Présenté pendant: IABSE Symposium: Engineering for Progress, Nature and People, Madrid, Spain, 3-5 September 2014.