Pat Moore
- (2013): Replacement of the Cable Stays at Ewijk Bridge, the Netherlands. Présenté pendant: IABSE Conference: Assessment, Upgrading and Refurbishment of Infrastructures, Rotterdam, The Netherlands, 6-8 May 2013.
- The Conceptual Design of the Ponte Palazzo. Présenté pendant: 4th International Conference Footbridge 2011, Wroclaw, Poland, 6-8 July 2011. (2011):