Reasonable Construction Procedures and Control Methods for a Concrete-Filled Steel Tube Arch Bridge Erected with Low Buckle Towers

 Reasonable Construction Procedures and Control Methods for a Concrete-Filled Steel Tube Arch Bridge Erected with Low Buckle Towers
Author(s): , , , ,
Presented at 18th IABSE Congress: Innovative Infrastructures – Towards Human Urbanism, Seoul, Korea, 19-21 September 2012, published in , pp. 1810-1817
DOI: 10.2749/222137912805112446
Price: € 25.00 incl. VAT for PDF document  
ADD TO CART
Download preview file (PDF) 0.15 MB

For the erection of an arch bridge with the method of inclined cable-stayed buckle, differently from high buckle tower scheme, the remarkable characteristic of low buckle tower scheme is that buckl...
Read more

Bibliographic Details

Author(s):




Medium: conference paper
Language(s): English
Conference: 18th IABSE Congress: Innovative Infrastructures – Towards Human Urbanism, Seoul, Korea, 19-21 September 2012
Published in:
Page(s): 1810-1817 Total no. of pages: 8
Page(s): 1810-1817
Total no. of pages: 8
DOI: 10.2749/222137912805112446
Abstract:

For the erection of an arch bridge with the method of inclined cable-stayed buckle, differently from high buckle tower scheme, the remarkable characteristic of low buckle tower scheme is that buckle cables near the vault have small horizontal inclinations and can provide minor vertical component forces. Take the Mengdonghe Bridge of Zhangjiajie-huayuan Expressway in Hunan Province of China as the engineering background, reasonable construction procedures and control methods were gained by mechanism analysis and numerical calculation of Finite Element Method under different construction procedures. The results show that: i) buckle and anchor cables should be loosen and removed before the pumping of filled concrete, ii) the order of the pumping of filled concrete should be from top chord steel tubes to bottom chord ones, iii) the loading sequence of spandrel constructions should be symmetrical from vault to skewback in classification with strips.

Keywords:
Concrete-Filled Steel Tube Arch Bridge method of inclined cable-stayed buckle low buckle tower reasonable construction procedure control principle