Reasonable Construction Procedures and Control Methods for a Concrete-Filled Steel Tube Arch Bridge Erected with Low Buckle Towers

 Reasonable Construction Procedures and Control Methods for a Concrete-Filled Steel Tube Arch Bridge Erected with Low Buckle Towers
Autor(en): , , , ,
Beitrag für 18th IABSE Congress: Innovative Infrastructures – Towards Human Urbanism, Seoul, Korea, 19-21 September 2012, veröffentlicht in , S. 1810-1817
DOI: 10.2749/222137912805112446
Preis: € 25,00 inkl. MwSt. als PDF-Dokument  
ZUM EINKAUFSWAGEN HINZUFÜGEN
Vorschau herunterladen (PDF-Datei) 0.15 MB

For the erection of an arch bridge with the method of inclined cable-stayed buckle, differently from high buckle tower scheme, the remarkable characteristic of low buckle tower scheme is that buckl...
Weiterlesen

Bibliografische Angaben

Autor(en):




Medium: Tagungsbeitrag
Sprache(n): Englisch
Tagung: 18th IABSE Congress: Innovative Infrastructures – Towards Human Urbanism, Seoul, Korea, 19-21 September 2012
Veröffentlicht in:
Seite(n): 1810-1817 Anzahl der Seiten (im PDF): 8
Seite(n): 1810-1817
Anzahl der Seiten (im PDF): 8
DOI: 10.2749/222137912805112446
Abstrakt:

For the erection of an arch bridge with the method of inclined cable-stayed buckle, differently from high buckle tower scheme, the remarkable characteristic of low buckle tower scheme is that buckle cables near the vault have small horizontal inclinations and can provide minor vertical component forces. Take the Mengdonghe Bridge of Zhangjiajie-huayuan Expressway in Hunan Province of China as the engineering background, reasonable construction procedures and control methods were gained by mechanism analysis and numerical calculation of Finite Element Method under different construction procedures. The results show that: i) buckle and anchor cables should be loosen and removed before the pumping of filled concrete, ii) the order of the pumping of filled concrete should be from top chord steel tubes to bottom chord ones, iii) the loading sequence of spandrel constructions should be symmetrical from vault to skewback in classification with strips.