Realisation of the Busan-Geoje Fixed Link - Large scale prefabrication for marine bridges
|
Bibliographic Details
Author(s): |
Jesper L. Asferg
Lars T. Sorensen Peter D. Frederiksen Lars Hauge |
||||
---|---|---|---|---|---|
Medium: | conference paper | ||||
Language(s): | English | ||||
Conference: | 18th IABSE Congress: Innovative Infrastructures – Towards Human Urbanism, Seoul, Korea, 19-21 September 2012 | ||||
Published in: | IABSE Congress Seoul 2012 | ||||
|
|||||
Page(s): | 651-659 | ||||
Total no. of pages: | 9 | ||||
DOI: | 10.2749/222137912805111014 | ||||
Abstract: |
This paper recaptures the design and construction of the bridges for the recently finalized Busan- Geoje Fixed Link in South Korea. The bridges included two cable stayed bridges with main spans of 475m respectively 2x230m. Main aspects of the bridge design are briefly summarized in this paper but focus is on the widely used prefabrication for the bridge construction and on the construction control method applied for super structure erection for the cabled stayed bridges. |
||||
Keywords: |
prefabrication construction control Stay cable bridges marine bridges concrete caissons steel-concrete composite girders AASHTO LRFD design
|