Port of Zeebrugge – Deepening of Container Handling Zeebrugge quay wall

 Port of Zeebrugge – Deepening of Container Handling Zeebrugge quay wall
Author(s): , , ,
Presented at IABSE Conference: Assessment, Upgrading and Refurbishment of Infrastructures, Rotterdam, The Netherlands, 6-8 May 2013, published in , pp. 636-637
DOI: 10.2749/222137813806548695
Price: € 25.00 incl. VAT for PDF document  
ADD TO CART
Download preview file (PDF) 0.35 MB

The Container Handling Zeebrugge quay wall was built in 1962-1970 and was designed for a water depth of 14m. The existing construction is of the “Danish type”, consisting of a concrete relieving fl...
Read more

Bibliographic Details

Author(s):



Medium: conference paper
Language(s): English
Conference: IABSE Conference: Assessment, Upgrading and Refurbishment of Infrastructures, Rotterdam, The Netherlands, 6-8 May 2013
Published in:
Page(s): 636-637 Total no. of pages: 8
Page(s): 636-637
Total no. of pages: 8
Year: 2013
DOI: 10.2749/222137813806548695
Abstract:

The Container Handling Zeebrugge quay wall was built in 1962-1970 and was designed for a water depth of 14m. The existing construction is of the “Danish type”, consisting of a concrete relieving floor on driven concrete piles and a steel sheet pile retaining wall. To make the quay accessible for container ships with a draught of up to 18 m a new front (combi-)wall will be erected. Behind the existing relieving floor new vertical tubular piles and MV piles driven at an angle of 50° to the horizontal will be installed. Cast in-situ and post-tensioned concrete beams with a slab on top will transfer the vertical loads to the front and rear tubular piles and transmit the horizontal forces to the MV piles. The corrosion rate of the existing sheet piles has been investigated allowing a structural verification and because of geometrical restrictions the results of a pile test were integrated in the design and this made it possible to reduce the number of piles.

Keywords:
pile test corrosion quay wall container terminal post-tensioning combined wall MV-piles quay deepening quay renovation