0
  • DE
  • EN
  • FR
  • International Database and Gallery of Structures

Advertisement

Planning and construction of the new Lauenburg lock

 Planning and construction of the new Lauenburg lock
Author(s):
Presented at IABSE Symposium: Improving Infrastructure Worldwide, Weimar, Germany, 19-21 September 2007, published in , pp. 108-109
DOI: 10.2749/weimar.2007.0408
Price: € 25.00 incl. VAT for PDF document  
ADD TO CART
Download preview file (PDF) 0.47 MB

The construction of the new lock in Lauenburg at the Elbe-Luebeck-Canal (ELK) including the most important construtional components of the lock and of the deep excavation is described. The preserva...
Read more

Bibliographic Details

Author(s):
Medium: conference paper
Language(s): English
Conference: IABSE Symposium: Improving Infrastructure Worldwide, Weimar, Germany, 19-21 September 2007
Published in:
Page(s): 108-109 Total no. of pages: 8
Page(s): 108-109
Total no. of pages: 8
Year: 2007
DOI: 10.2749/weimar.2007.0408
Abstract:

The construction of the new lock in Lauenburg at the Elbe-Luebeck-Canal (ELK) including the most important construtional components of the lock and of the deep excavation is described. The preservation of evidences and the monitoring system practised during all construction works are main important aspects in the articles. Design modifications, which became necessary during the construction, are described.

Keywords:
excavation monitoring system lock planning construction method inland waterway construction components preservation for evidences

Structures and Projects