Planning and construction of the new Lauenburg lock
|
Bibliographic Details
Author(s): |
Andreas Dohms
|
||||
---|---|---|---|---|---|
Medium: | conference paper | ||||
Language(s): | English | ||||
Conference: | IABSE Symposium: Improving Infrastructure Worldwide, Weimar, Germany, 19-21 September 2007 | ||||
Published in: | IABSE Symposium Weimar 2007 | ||||
|
|||||
Page(s): | 108-109 | ||||
Total no. of pages: | 8 | ||||
Year: | 2007 | ||||
DOI: | 10.2749/weimar.2007.0408 | ||||
Abstract: |
The construction of the new lock in Lauenburg at the Elbe-Luebeck-Canal (ELK) including the most important construtional components of the lock and of the deep excavation is described. The preservation of evidences and the monitoring system practised during all construction works are main important aspects in the articles. Design modifications, which became necessary during the construction, are described. |
||||
Keywords: |
excavation monitoring system lock planning construction method inland waterway construction components preservation for evidences
|