Planning and construction of the new Lauenburg lock
|
Détails bibliographiques
Auteur(s): |
Andreas Dohms
|
||||
---|---|---|---|---|---|
Médium: | papier de conférence | ||||
Langue(s): | anglais | ||||
Conférence: | IABSE Symposium: Improving Infrastructure Worldwide, Weimar, Germany, 19-21 September 2007 | ||||
Publié dans: | IABSE Symposium Weimar 2007 | ||||
|
|||||
Page(s): | 108-109 | ||||
Nombre total de pages (du PDF): | 8 | ||||
Année: | 2007 | ||||
DOI: | 10.2749/weimar.2007.0408 | ||||
Abstrait: |
The construction of the new lock in Lauenburg at the Elbe-Luebeck-Canal (ELK) including the most important construtional components of the lock and of the deep excavation is described. The preservation of evidences and the monitoring system practised during all construction works are main important aspects in the articles. Design modifications, which became necessary during the construction, are described. |
||||
Mots-clé: |
écluse
|