0
  • DE
  • EN
  • FR
  • International Database and Gallery of Structures

Advertisement

Mumbai Metro Line 2A – Challenges in Design and Execution

 Mumbai Metro Line 2A – Challenges in Design and Execution
Author(s): , , , ,
Presented at IABSE Conference: Engineering the Developing World, Kuala Lumpur, Malaysia, 25-27 April 2018, published in , pp. 299-306
DOI: 10.2749/kualalumpur.2018.0299
Price: € 25.00 incl. VAT for PDF document  
ADD TO CART
Download preview file (PDF) 0.27 MB

Mumbai Metro line 2A is part of the major Infrastructure overhaul being carried out in Mumbai under Mumbai Metropolitan Region Development Authority (MMRDA). This line is planned from Dahisar in th...
Read more

Bibliographic Details

Author(s): (Spectrum Techno Consultants Pvt Ltd, Navi Mumbai, India)
(Spectrum Techno Consultants Pvt Ltd, Navi Mumbai, India)
(Spectrum Techno Consultants Pvt Ltd, Navi Mumbai, India)
(Spectrum Techno Consultants Pvt Ltd, Navi Mumbai, India)
(JKumar Infraprojects Ltd., Mumbai, India)
Medium: conference paper
Language(s): English
Conference: IABSE Conference: Engineering the Developing World, Kuala Lumpur, Malaysia, 25-27 April 2018
Published in:
Page(s): 299-306 Total no. of pages: 8
Page(s): 299-306
Total no. of pages: 8
DOI: 10.2749/kualalumpur.2018.0299
Abstract:

Mumbai Metro line 2A is part of the major Infrastructure overhaul being carried out in Mumbai under Mumbai Metropolitan Region Development Authority (MMRDA). This line is planned from Dahisar in the northern boundary of the suburban city to Andheri in the heart of the suburbs. The overall length of the elevated corridor is about 20,6km with 17 stations, each of 185m length. The proposed metro line shall provide interconnectivity among the existing Western Express Highway, Western Railway, other existing and proposed metro lines. It is expected to reduce the traffic on highly congested suburban road network as well as the Western Express Highway. It is also expected to reduce the passenger load on the western line of the suburban railway network. This paper presents the various aspects of planning, design and construction considered for this project keeping in view its complexity with respect to location, space and time constraints.

Keywords:
bridges launching precast Metro station building