0
  • DE
  • EN
  • FR
  • Base de données et galerie internationale d'ouvrages d'art et du génie civil

Publicité

Mumbai Metro Line 2A – Challenges in Design and Execution

 Mumbai Metro Line 2A – Challenges in Design and Execution
Auteur(s): , , , ,
Présenté pendant IABSE Conference: Engineering the Developing World, Kuala Lumpur, Malaysia, 25-27 April 2018, publié dans , pp. 299-306
DOI: 10.2749/kualalumpur.2018.0299
Prix: € 25,00 incl. TVA pour document PDF  
AJOUTER AU PANIER
Télécharger l'aperçu (fichier PDF) 0.27 MB

Mumbai Metro line 2A is part of the major Infrastructure overhaul being carried out in Mumbai under Mumbai Metropolitan Region Development Authority (MMRDA). This line is planned from Dahisar in th...
Lire plus

Détails bibliographiques

Auteur(s): (Spectrum Techno Consultants Pvt Ltd, Navi Mumbai, India)
(Spectrum Techno Consultants Pvt Ltd, Navi Mumbai, India)
(Spectrum Techno Consultants Pvt Ltd, Navi Mumbai, India)
(Spectrum Techno Consultants Pvt Ltd, Navi Mumbai, India)
(JKumar Infraprojects Ltd., Mumbai, India)
Médium: papier de conférence
Langue(s): anglais
Conférence: IABSE Conference: Engineering the Developing World, Kuala Lumpur, Malaysia, 25-27 April 2018
Publié dans:
Page(s): 299-306 Nombre total de pages (du PDF): 8
Page(s): 299-306
Nombre total de pages (du PDF): 8
DOI: 10.2749/kualalumpur.2018.0299
Abstrait:

Mumbai Metro line 2A is part of the major Infrastructure overhaul being carried out in Mumbai under Mumbai Metropolitan Region Development Authority (MMRDA). This line is planned from Dahisar in the northern boundary of the suburban city to Andheri in the heart of the suburbs. The overall length of the elevated corridor is about 20,6km with 17 stations, each of 185m length. The proposed metro line shall provide interconnectivity among the existing Western Express Highway, Western Railway, other existing and proposed metro lines. It is expected to reduce the traffic on highly congested suburban road network as well as the Western Express Highway. It is also expected to reduce the passenger load on the western line of the suburban railway network. This paper presents the various aspects of planning, design and construction considered for this project keeping in view its complexity with respect to location, space and time constraints.

Mots-clé:
ponts