Monitoring a 150-year-old bridge during construction of an underpass for the London 2012 Games
|
Bibliographic Details
Author(s): |
David Baird
Martin Kirk Piotr Muszynski |
||||
---|---|---|---|---|---|
Medium: | conference paper | ||||
Language(s): | English | ||||
Conference: | 18th IABSE Congress: Innovative Infrastructures – Towards Human Urbanism, Seoul, Korea, 19-21 September 2012 | ||||
Published in: | IABSE Congress Seoul 2012 | ||||
|
|||||
Page(s): | 437-445 | ||||
Total no. of pages: | 9 | ||||
DOI: | 10.2749/222137912805110646 | ||||
Keywords: |
existing bridges monitoring London 2012 Olympic underpass cast-iron
|