Monitoring a 150-year-old bridge during construction of an underpass for the London 2012 Games
|
Bibliografische Angaben
Autor(en): |
David Baird
Martin Kirk Piotr Muszynski |
||||
---|---|---|---|---|---|
Medium: | Tagungsbeitrag | ||||
Sprache(n): | Englisch | ||||
Tagung: | 18th IABSE Congress: Innovative Infrastructures – Towards Human Urbanism, Seoul, Korea, 19-21 September 2012 | ||||
Veröffentlicht in: | IABSE Congress Seoul 2012 | ||||
|
|||||
Seite(n): | 437-445 | ||||
Anzahl der Seiten (im PDF): | 9 | ||||
DOI: | 10.2749/222137912805110646 | ||||
Stichwörter: |
Monitoring
|