0
  • DE
  • EN
  • FR
  • International Database and Gallery of Structures

Advertisement

Modelling of a major Composite Cable-stayed Bridge

 Modelling of a major Composite Cable-stayed Bridge
Author(s): , ,
Presented at IABSE Symposium: Large Structures and Infrastructures for Environmentally Constrained and Urbanised Areas, Venice, Italy, 22-24 September 2010, published in , pp. 250-251
DOI: 10.2749/222137810796024439
Price: € 25.00 incl. VAT for PDF document  
ADD TO CART
Download preview file (PDF) 0.08 MB

The second Jiaojiang Bridge is a composite cable-stayed bridge with the span arrangement of 70m+140m+480m+140m+70m. During the analysis, spatial grid model is adopted by the authors to undertake a ...
Read more

Bibliographic Details

Author(s):


Medium: conference paper
Language(s): English
Conference: IABSE Symposium: Large Structures and Infrastructures for Environmentally Constrained and Urbanised Areas, Venice, Italy, 22-24 September 2010
Published in:
Page(s): 250-251 Total no. of pages: 7
Page(s): 250-251
Total no. of pages: 7
Year: 2010
DOI: 10.2749/222137810796024439
Abstract:

The second Jiaojiang Bridge is a composite cable-stayed bridge with the span arrangement of 70m+140m+480m+140m+70m. During the analysis, spatial grid model is adopted by the authors to undertake a research program focusing on the modelling and reinforcement design of the concrete upper plate of the composite box girder. The advantage of this model is that the stress results cover all the spatial effects including shear lag, statically indeterminate shear flow inside the side boxes and in the concrete upper plate.

Keywords:
box girder composite cable-stayed bridge concrete deck spatial grid model reinforcement design

Structures and Projects