0
  • DE
  • EN
  • FR
  • Base de données et galerie internationale d'ouvrages d'art et du génie civil

Publicité

Modelling of a major Composite Cable-stayed Bridge

 Modelling of a major Composite Cable-stayed Bridge
Auteur(s): , ,
Présenté pendant IABSE Symposium: Large Structures and Infrastructures for Environmentally Constrained and Urbanised Areas, Venice, Italy, 22-24 September 2010, publié dans , pp. 250-251
DOI: 10.2749/222137810796024439
Prix: € 25,00 incl. TVA pour document PDF  
AJOUTER AU PANIER
Télécharger l'aperçu (fichier PDF) 0.08 MB

The second Jiaojiang Bridge is a composite cable-stayed bridge with the span arrangement of 70m+140m+480m+140m+70m. During the analysis, spatial grid model is adopted by the authors to undertake a ...
Lire plus

Détails bibliographiques

Auteur(s):


Médium: papier de conférence
Langue(s): anglais
Conférence: IABSE Symposium: Large Structures and Infrastructures for Environmentally Constrained and Urbanised Areas, Venice, Italy, 22-24 September 2010
Publié dans:
Page(s): 250-251 Nombre total de pages (du PDF): 7
Page(s): 250-251
Nombre total de pages (du PDF): 7
Année: 2010
DOI: 10.2749/222137810796024439
Abstrait:

The second Jiaojiang Bridge is a composite cable-stayed bridge with the span arrangement of 70m+140m+480m+140m+70m. During the analysis, spatial grid model is adopted by the authors to undertake a research program focusing on the modelling and reinforcement design of the concrete upper plate of the composite box girder. The advantage of this model is that the stress results cover all the spatial effects including shear lag, statically indeterminate shear flow inside the side boxes and in the concrete upper plate.

Mots-clé:
caisson

Ouvrages et projets