M48 Severn Crossing, UK. Wye Bridge / Beachley Viaduct Rocker Replacement
|
Bibliographic Details
Author(s): |
Chris Murphy
Aogan Mulcahy Jeremy Cutter |
||||
---|---|---|---|---|---|
Medium: | conference paper | ||||
Language(s): | English | ||||
Conference: | IABSE Symposium: Engineering for Progress, Nature and People, Madrid, Spain, 3-5 September 2014 | ||||
Published in: | IABSE Symposium Madrid 2014 | ||||
|
|||||
Page(s): | 2658-2665 | ||||
Total no. of pages: | 8 | ||||
Year: | 2014 | ||||
DOI: | 10.2749/222137814814070073 | ||||
Abstract: |
The original design of the Wye Bridge and Beachley Viaduct accommodated thermal movements with an expansion joint – located at approximately the mid-point of the structure. This paper describes the development and execution of a scheme to address the material wear at the bearing surfaces and to improve the ride-quality over the joint by replacing the two rocker arm units which link the box girders either side of the expansion joint. |
||||
Keywords: |
box girder bridges expansion joints rocker bearings steel bridge strengthening
|