M48 Severn Crossing, UK. Wye Bridge / Beachley Viaduct Rocker Replacement
|
Détails bibliographiques
Auteur(s): |
Chris Murphy
Aogan Mulcahy Jeremy Cutter |
||||
---|---|---|---|---|---|
Médium: | papier de conférence | ||||
Langue(s): | anglais | ||||
Conférence: | IABSE Symposium: Engineering for Progress, Nature and People, Madrid, Spain, 3-5 September 2014 | ||||
Publié dans: | IABSE Symposium Madrid 2014 | ||||
|
|||||
Page(s): | 2658-2665 | ||||
Nombre total de pages (du PDF): | 8 | ||||
Année: | 2014 | ||||
DOI: | 10.2749/222137814814070073 | ||||
Abstrait: |
The original design of the Wye Bridge and Beachley Viaduct accommodated thermal movements with an expansion joint – located at approximately the mid-point of the structure. This paper describes the development and execution of a scheme to address the material wear at the bearing surfaces and to improve the ride-quality over the joint by replacing the two rocker arm units which link the box girders either side of the expansion joint. |
||||
Mots-clé: |
Ponts en poutre-caisson joints de chaussées
|