0
  • DE
  • EN
  • FR
  • International Database and Gallery of Structures

Advertisement

The lifting, transport and placing of the Øresund pylon caissons

Author(s):


Medium: conference paper
Language(s): English
Conference: IABSE Conference: Cable-Stayed Bridges - Past, Present and Future, Malmö, Sweden, 2-4 June 1999
Published in:
Page(s): 263-272
Year: 1999
DOI: 10.5169/seals-62135

Structures and Projects

Structurae cannot make the full text of this publication available at this time. The full text can be accessed through the publisher via the DOI: 10.5169/seals-62135.
  • About this
    data sheet
  • Reference-ID
    10010754
  • Published on:
    20/11/2003
  • Last updated on:
    20/02/2021
 
Structurae cooperates with
International Association for Bridge and Structural Engineering (IABSE)
e-mosty Magazine
e-BrIM Magazine