0
  • DE
  • EN
  • FR
  • International Database and Gallery of Structures

Advertisement

Lifting and Rehabilitation of 5 Highway Overpasses in Brazil

 Lifting and Rehabilitation of 5 Highway Overpasses in Brazil
Author(s): , , ,
Presented at IABSE Congress: Bridges and Structures: Connection, Integration and Harmonisation, Nanjing, People's Republic of China, 21-23 September 2022, published in , pp. 1659-1667
DOI: 10.2749/nanjing.2022.1659
Price: € 25.00 incl. VAT for PDF document  
ADD TO CART
Download preview file (PDF) 0.16 MB

This paper presents the structural solution for the lifting and rehabilitation of 5 overpasses crossing a Federal Highway, located in the south part of Brazil. All structures were built in the 1960...
Read more

Bibliographic Details

Author(s): (Casagrande Engenharia (CAGEN), Rio de Janeiro, RJ, Brazil)
(Casagrande Engenharia (CAGEN), Rio de Janeiro, RJ, Brazil)
(Casagrande Engenharia (CAGEN), Rio de Janeiro, RJ, Brazil)
(Casagrande Engenharia (CAGEN), Rio de Janeiro, RJ, Brazil)
Medium: conference paper
Language(s): English
Conference: IABSE Congress: Bridges and Structures: Connection, Integration and Harmonisation, Nanjing, People's Republic of China, 21-23 September 2022
Published in:
Page(s): 1659-1667 Total no. of pages: 9
Page(s): 1659-1667
Total no. of pages: 9
DOI: 10.2749/nanjing.2022.1659
Abstract:

This paper presents the structural solution for the lifting and rehabilitation of 5 overpasses crossing a Federal Highway, located in the south part of Brazil. All structures were built in the 1960s, a period in which the design practice required a minimum height of 5,0 m to allow the flow of vehicles under the deck. Due to the recent expansion of taller vehicles and increment of traffic in the region, the highway administrator, in order to meet the space requirements of 5,5 m, financed both project and construction works. The main requirement was to carry out the entire construction without causing the interruption of traffic under the overpasses. The proposed solution included: preliminary static load tests, construction of corbels to support hydraulic jacks, localized strengthening of structural components, replacement of the originally designed fixed bearings by new elastomeric bearings and the heightening of the piers using steel plates as reinforcement.

Keywords:
load test strengthening rehabilitation lifting overpass
Copyright: © 2022 International Association for Bridge and Structural Engineering (IABSE)
License:

This creative work is copyrighted material and may not be used without explicit approval by the author and/or copyright owner.