Lifting and Rehabilitation of 5 Highway Overpasses in Brazil

 Lifting and Rehabilitation of 5 Highway Overpasses in Brazil
Auteur(s): , , ,
Présenté pendant IABSE Congress: Bridges and Structures: Connection, Integration and Harmonisation, Nanjing, People's Republic of China, 21-23 September 2022, publié dans , pp. 1659-1667
DOI: 10.2749/nanjing.2022.1659
Prix: € 25,00 incl. TVA pour document PDF  
AJOUTER AU PANIER
Télécharger l'aperçu (fichier PDF) 0.16 MB

This paper presents the structural solution for the lifting and rehabilitation of 5 overpasses crossing a Federal Highway, located in the south part of Brazil. All structures were built in the 1960...
Lire plus

Détails bibliographiques

Auteur(s): (Casagrande Engenharia (CAGEN), Rio de Janeiro, RJ, Brazil)
(Casagrande Engenharia (CAGEN), Rio de Janeiro, RJ, Brazil)
(Casagrande Engenharia (CAGEN), Rio de Janeiro, RJ, Brazil)
(Casagrande Engenharia (CAGEN), Rio de Janeiro, RJ, Brazil)
Médium: papier de conférence
Langue(s): anglais
Conférence: IABSE Congress: Bridges and Structures: Connection, Integration and Harmonisation, Nanjing, People's Republic of China, 21-23 September 2022
Publié dans:
Page(s): 1659-1667 Nombre total de pages (du PDF): 9
Page(s): 1659-1667
Nombre total de pages (du PDF): 9
DOI: 10.2749/nanjing.2022.1659
Abstrait:

This paper presents the structural solution for the lifting and rehabilitation of 5 overpasses crossing a Federal Highway, located in the south part of Brazil. All structures were built in the 1960s, a period in which the design practice required a minimum height of 5,0 m to allow the flow of vehicles under the deck. Due to the recent expansion of taller vehicles and increment of traffic in the region, the highway administrator, in order to meet the space requirements of 5,5 m, financed both project and construction works. The main requirement was to carry out the entire construction without causing the interruption of traffic under the overpasses. The proposed solution included: preliminary static load tests, construction of corbels to support hydraulic jacks, localized strengthening of structural components, replacement of the originally designed fixed bearings by new elastomeric bearings and the heightening of the piers using steel plates as reinforcement.

Mots-clé:
renforcement
Copyright: © 2022 International Association for Bridge and Structural Engineering (IABSE)