Investigation on Construction Quality Indices for Concrete Box Girders

 Investigation on Construction Quality Indices for Concrete Box Girders
Author(s): , ,
Presented at IABSE Symposium: Large Structures and Infrastructures for Environmentally Constrained and Urbanised Areas, Venice, Italy, 22-24 September 2010, published in , pp. 606-607
DOI: 10.2749/222137810796062923
Price: € 25.00 incl. VAT for PDF document  
ADD TO CART
Download preview file (PDF) 0.03 MB

Based on three bridge dismantlement, two construction quality indices were investigated in-situ, which consisted of duct grouting compaction of prestressing tendons, excess concrete rate in box gir...
Read more

Bibliographic Details

Author(s):


Medium: conference paper
Language(s): English
Conference: IABSE Symposium: Large Structures and Infrastructures for Environmentally Constrained and Urbanised Areas, Venice, Italy, 22-24 September 2010
Published in:
Page(s): 606-607 Total no. of pages: 7
Page(s): 606-607
Total no. of pages: 7
Year: 2010
DOI: 10.2749/222137810796062923
Abstract:

Based on three bridge dismantlement, two construction quality indices were investigated in-situ, which consisted of duct grouting compaction of prestressing tendons, excess concrete rate in box girder. The result indicated that the excess concrete rate in box-girders, varied between 10% to 20% and the concrete excess centred at the top slab and bottom slab. The duct for prestressing tendons were only partially grouted, with over 50% ungrouted for longitudinal tendons and over 70% ungrouted for transverse tendons. Obviously, this would increased the prestress loss in the tendons,and increased the possibility of structure cracking. It was helpful for realising the true performance of box-girders.

Keywords:
bridge concrete box girder construction quality duct grouting concrete excess