Investigation on Construction Quality Indices for Concrete Box Girders

 Investigation on Construction Quality Indices for Concrete Box Girders
Auteur(s): , ,
Présenté pendant IABSE Symposium: Large Structures and Infrastructures for Environmentally Constrained and Urbanised Areas, Venice, Italy, 22-24 September 2010, publié dans , pp. 606-607
DOI: 10.2749/222137810796062923
Prix: € 25,00 incl. TVA pour document PDF  
AJOUTER AU PANIER
Télécharger l'aperçu (fichier PDF) 0.03 MB

Based on three bridge dismantlement, two construction quality indices were investigated in-situ, which consisted of duct grouting compaction of prestressing tendons, excess concrete rate in box gir...
Lire plus

Détails bibliographiques

Auteur(s):


Médium: papier de conférence
Langue(s): anglais
Conférence: IABSE Symposium: Large Structures and Infrastructures for Environmentally Constrained and Urbanised Areas, Venice, Italy, 22-24 September 2010
Publié dans:
Page(s): 606-607 Nombre total de pages (du PDF): 7
Page(s): 606-607
Nombre total de pages (du PDF): 7
Année: 2010
DOI: 10.2749/222137810796062923
Abstrait:

Based on three bridge dismantlement, two construction quality indices were investigated in-situ, which consisted of duct grouting compaction of prestressing tendons, excess concrete rate in box girder. The result indicated that the excess concrete rate in box-girders, varied between 10% to 20% and the concrete excess centred at the top slab and bottom slab. The duct for prestressing tendons were only partially grouted, with over 50% ungrouted for longitudinal tendons and over 70% ungrouted for transverse tendons. Obviously, this would increased the prestress loss in the tendons,and increased the possibility of structure cracking. It was helpful for realising the true performance of box-girders.

Mots-clé:
pont