Integrated BIM for failure-free retrofitting of a motorway tunnel
|
Bibliographic Details
Author(s): |
Johannes Anrijs
(BIM Manager, BESIX, Brussels, Belgium)
Jan van Steirteghem (Director Engineering Department, BESIX, Brussels, Belgium) |
||||
---|---|---|---|---|---|
Medium: | conference paper | ||||
Language(s): | English | ||||
Conference: | IABSE Conference: Creativity and Collaboration – Instilling Imagination and Innovation in Structural Design, Bath, United Kingdom, 19-20 April 2017 | ||||
Published in: | IABSE Conference Bath, April 19-20, 2017 | ||||
|
|||||
Page(s): | 116-118 | ||||
Total no. of pages: | 3 | ||||
Year: | 2017 | ||||
DOI: | 10.2749/222137817821233134 | ||||
Abstract: |
Nowadays numerous tunnels need in-depth retrofitting to comply with EU Tunnel safety regulations. To deal with the high project complexity and accomplish the goal within the tight deadlines, the Velsertunnel project team identified the key risks and controlled them by use of some innovative methods and collaborative tools. |
||||
Keywords: |
renovation virtual reality systems engineering BIM innovation tunnel scrum
|