Integrated BIM for failure-free retrofitting of a motorway tunnel
|
Détails bibliographiques
Auteur(s): |
Johannes Anrijs
(BIM Manager, BESIX, Brussels, Belgium)
Jan van Steirteghem (Director Engineering Department, BESIX, Brussels, Belgium) |
||||
---|---|---|---|---|---|
Médium: | papier de conférence | ||||
Langue(s): | anglais | ||||
Conférence: | IABSE Conference: Creativity and Collaboration – Instilling Imagination and Innovation in Structural Design, Bath, United Kingdom, 19-20 April 2017 | ||||
Publié dans: | Creativity and Collaboration | ||||
|
|||||
Page(s): | 116-118 | ||||
Nombre total de pages (du PDF): | 3 | ||||
Année: | 2017 | ||||
DOI: | 10.2749/222137817821233134 | ||||
Abstrait: |
Nowadays numerous tunnels need in-depth retrofitting to comply with EU Tunnel safety regulations. To deal with the high project complexity and accomplish the goal within the tight deadlines, the Velsertunnel project team identified the key risks and controlled them by use of some innovative methods and collaborative tools. |
||||
Mots-clé: |
BIM innovation tunnel
|