0
  • DE
  • EN
  • FR
  • International Database and Gallery of Structures

Advertisement

Integrated Asset Management Tool for Highway Infrastructure

 Integrated Asset Management Tool for Highway Infrastructure
Author(s): , , ,
Presented at IABSE Conference: Assessment, Upgrading and Refurbishment of Infrastructures, Rotterdam, The Netherlands, 6-8 May 2013, published in , pp. 62-63
DOI: 10.2749/222137813806474219
Price: € 25.00 incl. VAT for PDF document  
ADD TO CART
Download preview file (PDF) 5.12 MB

To enable proper and long-term maintenance planning for a huge and heterogeneous set of engineering structures (bridges, culverts, noise barriers, gantries) the authors developed an integrated life...
Read more

Bibliographic Details

Author(s):



Medium: conference paper
Language(s): English
Conference: IABSE Conference: Assessment, Upgrading and Refurbishment of Infrastructures, Rotterdam, The Netherlands, 6-8 May 2013
Published in:
Page(s): 62-63 Total no. of pages: 8
Page(s): 62-63
Total no. of pages: 8
Year: 2013
DOI: 10.2749/222137813806474219
Abstract:

To enable proper and long-term maintenance planning for a huge and heterogeneous set of engineering structures (bridges, culverts, noise barriers, gantries) the authors developed an integrated life cycle management tool that offers tailored solutions with regard to the given location, involved materials, fabricates and the underlying design code at the time of construction. The core of this tool is formed by a probabilistic ageing model and a comprehensive cost model. Each structural member is represented by a generic ageing function, which is derived from the major sources of information reflecting impact on structural ageing (visual inspection/ numerical simulation/ structural monitoring and freight traffic progression). Furthermore the model incorporates VCE’s 50 years of experience in the field of bridge inspections and structural health monitoring. Due to defined treatment-trigger-criteria a huge set of maintenance strategies is generated leading to an extensive optimization exercise. The final project output is composed by tailored maintenance plans for every structure.

Keywords:
optimization maintenance strategies remaining lifetime Decision Tools