0
  • DE
  • EN
  • FR
  • Internationale Datenbank und Galerie für Ingenieurbauwerke

Anzeige

Integrated Asset Management Tool for Highway Infrastructure

 Integrated Asset Management Tool for Highway Infrastructure
Autor(en): , , ,
Beitrag für IABSE Conference: Assessment, Upgrading and Refurbishment of Infrastructures, Rotterdam, The Netherlands, 6-8 May 2013, veröffentlicht in , S. 62-63
DOI: 10.2749/222137813806474219
Preis: € 25,00 inkl. MwSt. als PDF-Dokument  
ZUM EINKAUFSWAGEN HINZUFÜGEN
Vorschau herunterladen (PDF-Datei) 5.12 MB

To enable proper and long-term maintenance planning for a huge and heterogeneous set of engineering structures (bridges, culverts, noise barriers, gantries) the authors developed an integrated life...
Weiterlesen

Bibliografische Angaben

Autor(en):



Medium: Tagungsbeitrag
Sprache(n): Englisch
Tagung: IABSE Conference: Assessment, Upgrading and Refurbishment of Infrastructures, Rotterdam, The Netherlands, 6-8 May 2013
Veröffentlicht in:
Seite(n): 62-63 Anzahl der Seiten (im PDF): 8
Seite(n): 62-63
Anzahl der Seiten (im PDF): 8
Jahr: 2013
DOI: 10.2749/222137813806474219
Abstrakt:

To enable proper and long-term maintenance planning for a huge and heterogeneous set of engineering structures (bridges, culverts, noise barriers, gantries) the authors developed an integrated life cycle management tool that offers tailored solutions with regard to the given location, involved materials, fabricates and the underlying design code at the time of construction. The core of this tool is formed by a probabilistic ageing model and a comprehensive cost model. Each structural member is represented by a generic ageing function, which is derived from the major sources of information reflecting impact on structural ageing (visual inspection/ numerical simulation/ structural monitoring and freight traffic progression). Furthermore the model incorporates VCE’s 50 years of experience in the field of bridge inspections and structural health monitoring. Due to defined treatment-trigger-criteria a huge set of maintenance strategies is generated leading to an extensive optimization exercise. The final project output is composed by tailored maintenance plans for every structure.