0
  • DE
  • EN
  • FR
  • International Database and Gallery of Structures

Advertisement

Installation of the largest stay cable system in Poland – the Rędziński bridge in Wrocław

 Installation of the largest stay cable system in Poland – the Rędziński bridge in Wrocław
Author(s): ORCID,
Presented at 18th IABSE Congress: Innovative Infrastructures – Towards Human Urbanism, Seoul, Korea, 19-21 September 2012, published in , pp. 811-818
DOI: 10.2749/222137912805111186
Price: € 25.00 incl. VAT for PDF document  
ADD TO CART
Download preview file (PDF) 0.71 MB

The City of Wrocław has been surrounded by the highway bypass since the year 2011. There is a large cable-stayed bridge along that way across the Odra River including two main spans each 256 m long...
Read more

Bibliographic Details

Author(s): ORCID

Medium: conference paper
Language(s): English
Conference: 18th IABSE Congress: Innovative Infrastructures – Towards Human Urbanism, Seoul, Korea, 19-21 September 2012
Published in:
Page(s): 811-818 Total no. of pages: 8
Page(s): 811-818
Total no. of pages: 8
DOI: 10.2749/222137912805111186
Abstract:

The City of Wrocław has been surrounded by the highway bypass since the year 2011. There is a large cable-stayed bridge along that way across the Odra River including two main spans each 256 m long. The height of the pylon is 122 m. The deck is supported from 160 stays Freyssinet HD2000 type. Total quantity of steel in stays reached about 1500 tons. The installation of stay cables was arranged according to Freyssinet Isotension procedure, as well as the specialized equipment supplied by Freyssinet was widely used. Time period consumed for installation was extremely short, it lasted about two months. As the result a modern elegant bridge appeared enriching the landscape of Wrocław peripheries.

Keywords:
cable-stayed bridge bridge construction concrete superstructure stays installation

Structures and Projects