Innovative Technology at the Deconstruction of Bridges
|
Bibliographic Details
Author(s): |
Karl-Heinz Reintjes
|
||||
---|---|---|---|---|---|
Medium: | conference paper | ||||
Language(s): | English | ||||
Conference: | IABSE Conference: Bridges and Structures Sustainability - Seeking Intelligent Solutions, Guangzhou, China, 8-11 May 2016 | ||||
Published in: | IABSE Conference, Guangzhou, China, 8 – 11 May 2016 | ||||
|
|||||
Page(s): | 1006-1013 | ||||
Total no. of pages: | 8 | ||||
Year: | 2016 | ||||
DOI: | 10.2749/222137816819259419 | ||||
Abstract: |
Special methods had to be developed for the deconstruction of two bridges in the course of the widening of the motorway A7 in Hamburg. At one bridge blocks of ultra high strength concrete with steel fibres are used as temporary anchoring of the prestress tendons. At the other bridge the old concrete superstructure is removed by a special incremental launching backwards. |
||||
Keywords: |
fibre concrete bridge deconstruction temporary anchors for internal prestress ultra high strength concrete deconstruction by incremental launching
|