0
  • DE
  • EN
  • FR
  • International Database and Gallery of Structures

Advertisement

Innovative solution for an Extradosed bridge over river Beas in Hilly Terrain of Himalayas

 Innovative solution for an Extradosed bridge over river Beas in Hilly Terrain of Himalayas
Author(s): , ,
Presented at IABSE Congress: Engineering for Sustainable Development, New Delhi, India, 20-22 September 2023, published in , pp. 428-435
DOI: 10.2749/newdelhi.2023.0428
Price: € 25.00 incl. VAT for PDF document  
ADD TO CART
Download preview file (PDF) 0.98 MB

Road Network of Himachal Pradesh, a northern state in India requires number of long span bridges across valleys and rivers due to its hilly terrain. One such bridge across river Beas at Hanogi has ...
Read more

Bibliographic Details

Author(s): (SPECTRUM Techno Consultants Pvt Ltd, Navi Mumbai, India)
(Chairman and Managing Director, Construma Consultancy Pvt. Ltd.)
(SPECTRUM Techno Consultants Pvt Ltd, Navi Mumbai, India)
Medium: conference paper
Language(s): English
Conference: IABSE Congress: Engineering for Sustainable Development, New Delhi, India, 20-22 September 2023
Published in:
Page(s): 428-435 Total no. of pages: 8
Page(s): 428-435
Total no. of pages: 8
DOI: 10.2749/newdelhi.2023.0428
Abstract:

Road Network of Himachal Pradesh, a northern state in India requires number of long span bridges across valleys and rivers due to its hilly terrain. One such bridge across river Beas at Hanogi has a total length of 119.2m. Proposed span arrangement at the location of this bridge is

97.2m + 22m. National Highway (NH-3) runs perpendicular to the bridge. The bridge is located in a constrained location with approach road on one side and a hillock with NH-3 at its toe on the other side. It was proposed to build an extradosed bridge of span 97.2m with pylon only on abutment A2 side and back stay cables anchored in hillock formed of rock.

This paper presents design aspects of the extradosed superstructure and cables, back stay anchors, Abutment A2 and staged construction analysis. The construction of the bridge is carried out by cantilever method with form traveler. This paper also covers construction methodology of the superstructure, ground Improvement and stability check at abutment A2 and Hillock where the stays are anchored.

This is one of the unique extradosed bridge where long span on one side is supported by cables on single pylon and back stay cables are anchored to the rock.

Keywords:
extradosed bridge ground improvement cantilever construction Rock Anchored

Structures and Projects