0
  • DE
  • EN
  • FR
  • Internationale Datenbank und Galerie für Ingenieurbauwerke

Anzeige

Innovative solution for an Extradosed bridge over river Beas in Hilly Terrain of Himalayas

 Innovative solution for an Extradosed bridge over river Beas in Hilly Terrain of Himalayas
Autor(en): , ,
Beitrag für IABSE Congress: Engineering for Sustainable Development, New Delhi, India, 20-22 September 2023, veröffentlicht in , S. 428-435
DOI: 10.2749/newdelhi.2023.0428
Preis: € 25,00 inkl. MwSt. als PDF-Dokument  
ZUM EINKAUFSWAGEN HINZUFÜGEN
Vorschau herunterladen (PDF-Datei) 0.98 MB

Road Network of Himachal Pradesh, a northern state in India requires number of long span bridges across valleys and rivers due to its hilly terrain. One such bridge across river Beas at Hanogi has ...
Weiterlesen

Bibliografische Angaben

Autor(en): (SPECTRUM Techno Consultants Pvt Ltd, Navi Mumbai, India)
(Chairman and Managing Director, Construma Consultancy Pvt. Ltd.)
(SPECTRUM Techno Consultants Pvt Ltd, Navi Mumbai, India)
Medium: Tagungsbeitrag
Sprache(n): Englisch
Tagung: IABSE Congress: Engineering for Sustainable Development, New Delhi, India, 20-22 September 2023
Veröffentlicht in:
Seite(n): 428-435 Anzahl der Seiten (im PDF): 8
Seite(n): 428-435
Anzahl der Seiten (im PDF): 8
DOI: 10.2749/newdelhi.2023.0428
Abstrakt:

Road Network of Himachal Pradesh, a northern state in India requires number of long span bridges across valleys and rivers due to its hilly terrain. One such bridge across river Beas at Hanogi has a total length of 119.2m. Proposed span arrangement at the location of this bridge is

97.2m + 22m. National Highway (NH-3) runs perpendicular to the bridge. The bridge is located in a constrained location with approach road on one side and a hillock with NH-3 at its toe on the other side. It was proposed to build an extradosed bridge of span 97.2m with pylon only on abutment A2 side and back stay cables anchored in hillock formed of rock.

This paper presents design aspects of the extradosed superstructure and cables, back stay anchors, Abutment A2 and staged construction analysis. The construction of the bridge is carried out by cantilever method with form traveler. This paper also covers construction methodology of the superstructure, ground Improvement and stability check at abutment A2 and Hillock where the stays are anchored.

This is one of the unique extradosed bridge where long span on one side is supported by cables on single pylon and back stay cables are anchored to the rock.

Stichwörter:
Extradosed-Brücke Bodenverbesserung

Bauwerke und Projekte