Incremental launching method for bridges of Northern Marmara Motorway, Turkey

 Incremental launching method for bridges of Northern Marmara Motorway, Turkey
Author(s): , , , ,
Presented at IABSE Symposium: Engineering the Future, Vancouver, Canada, 21-23 September 2017, published in , pp. 3206-3213
DOI: 10.2749/222137817822208816
Price: € 25.00 incl. VAT for PDF document  
ADD TO CART
Download preview file (PDF) 0.12 MB

This paper presents the challenge of the incremental launching of three viaducts of the Northern Marmara Motorway project in Istanbul Turkey. The incremental launching method (ILM) was pushed at it...
Read more

Bibliographic Details

Author(s): (Freyssinet International, Rueil-Malmaison, France Aydin Alpman, Cagri Yayim, Ozkul Ozgur FREYSAS, Istanbul, Turkey)
(Freyssinet International, Rueil-Malmaison, France Aydin Alpman, Cagri Yayim, Ozkul Ozgur FREYSAS, Istanbul, Turkey)
(Freyssinet International, Rueil-Malmaison, France Aydin Alpman, Cagri Yayim, Ozkul Ozgur FREYSAS, Istanbul, Turkey)
(Freyssinet International, Rueil-Malmaison, France Aydin Alpman, Cagri Yayim, Ozkul Ozgur FREYSAS, Istanbul, Turkey)
(Freyssinet International, Rueil-Malmaison, France Aydin Alpman, Cagri Yayim, Ozkul Ozgur FREYSAS, Istanbul, Turkey)
(Freyssinet International, Rueil-Malmaison, France Aydin Alpman, Cagri Yayim, Ozkul Ozgur FREYSAS, Istanbul, Turkey)
Medium: conference paper
Language(s): English
Conference: IABSE Symposium: Engineering the Future, Vancouver, Canada, 21-23 September 2017
Published in:
Page(s): 3206-3213 Total no. of pages: 8
Page(s): 3206-3213
Total no. of pages: 8
Year: 2017
DOI: 10.2749/222137817822208816
Abstract:

This paper presents the challenge of the incremental launching of three viaducts of the Northern Marmara Motorway project in Istanbul Turkey. The incremental launching method (ILM) was pushed at its own limit to be adapted to this Viaduct. The deck, with 55 meter long spans, was moved by sliding on piers up to 82 meter high through a complex vertical and horizontal alignment.

This paper gives an overview of this construction methods, and the specificity of these viaducts. In particular, specific procedures were implemented to control the behaviour of the piers during launching operations, due to their slenderness and their non-conventional anti-seismic design. Specific geometric checks were also necessary to follow the launching curve. Temporary structure associate to ILM will also be described in the paper: prefabrication yard, design and construction of the launching nose, choice and design of launching devices.

Keywords:
slenderness survey curve temporary structure Incremental launching method (ILM) anti-seismic load control