Cagri Yayim
- (2017): Incremental launching method for bridges of Northern Marmara Motorway, Turkey. Presented at: IABSE Symposium: Engineering the Future, Vancouver, Canada, 21-23 September 2017.
- (2017): Calli Extradosed Bridge: Fast track project for an extradosed bridge in seismic area. Presented at: IABSE Symposium: Engineering the Future, Vancouver, Canada, 21-23 September 2017.
- (2017): Besiktas stadium roof : innovative design and construction method. Presented at: IABSE Symposium: Engineering the Future, Vancouver, Canada, 21-23 September 2017.