0
  • DE
  • EN
  • FR
  • International Database and Gallery of Structures

Advertisement

Implementation of OVM Prestressing System in Southeast European Infrastructure Projects

 Implementation of OVM Prestressing System in Southeast European Infrastructure Projects
Author(s):
Presented at IABSE Congress: Bridges and Structures: Connection, Integration and Harmonisation, Nanjing, People's Republic of China, 21-23 September 2022, published in , pp. 2078
DOI: 10.2749/nanjing.2022.2078
This publication is not currently available in full text.
Download preview file (PDF) 0.15 MB

Application of prestressing technology during bridge construction impersonates challenge according to all design parameters, using of traditional materials, conditions of environment, composite of ...
Read more

Bibliographic Details

Author(s): (Department for structures and prestressing, IMS Institute, Belgrade 11000, Serbia)
Medium: conference paper
Language(s): English
Conference: IABSE Congress: Bridges and Structures: Connection, Integration and Harmonisation, Nanjing, People's Republic of China, 21-23 September 2022
Published in:
Page(s): 2078 Total no. of pages: 1
Page(s): 2078
Total no. of pages: 1
DOI: 10.2749/nanjing.2022.2078
Abstract:

Application of prestressing technology during bridge construction impersonates challenge according to all design parameters, using of traditional materials, conditions of environment, composite of steel and concrete materials represent only some of requests which must be fulfilled and enable structure designed service life. Charasteristic examples of implementation of OVM prestressing system in southeast European infrastructure projects are described in this paper, where each of it had specific limit in the terms of opportunities of applying of different construction method: movable scaffold system, incremental launching, concrete arch, heavy scaffolding, prefabrication of prestressed girders.

Keywords:
construction method infrastructure projects prestressing of bridges