0
  • DE
  • EN
  • FR
  • Internationale Datenbank und Galerie für Ingenieurbauwerke

Anzeige

Implementation of OVM Prestressing System in Southeast European Infrastructure Projects

 Implementation of OVM Prestressing System in Southeast European Infrastructure Projects
Autor(en):
Beitrag für IABSE Congress: Bridges and Structures: Connection, Integration and Harmonisation, Nanjing, People's Republic of China, 21-23 September 2022, veröffentlicht in , S. 2078
DOI: 10.2749/nanjing.2022.2078
Diese Veröffentlichung ist derzeit nicht als Volltext verfügbar.
Vorschau herunterladen (PDF-Datei) 0.15 MB

Application of prestressing technology during bridge construction impersonates challenge according to all design parameters, using of traditional materials, conditions of environment, composite of ...
Weiterlesen

Bibliografische Angaben

Autor(en): (Department for structures and prestressing, IMS Institute, Belgrade 11000, Serbia)
Medium: Tagungsbeitrag
Sprache(n): Englisch
Tagung: IABSE Congress: Bridges and Structures: Connection, Integration and Harmonisation, Nanjing, People's Republic of China, 21-23 September 2022
Veröffentlicht in:
Seite(n): 2078 Anzahl der Seiten (im PDF): 1
Seite(n): 2078
Anzahl der Seiten (im PDF): 1
DOI: 10.2749/nanjing.2022.2078
Abstrakt:

Application of prestressing technology during bridge construction impersonates challenge according to all design parameters, using of traditional materials, conditions of environment, composite of steel and concrete materials represent only some of requests which must be fulfilled and enable structure designed service life. Charasteristic examples of implementation of OVM prestressing system in southeast European infrastructure projects are described in this paper, where each of it had specific limit in the terms of opportunities of applying of different construction method: movable scaffold system, incremental launching, concrete arch, heavy scaffolding, prefabrication of prestressed girders.

Stichwörter:
Bauverfahren