0
  • DE
  • EN
  • FR
  • International Database and Gallery of Structures

Advertisement

Impact of corrosion on the first immersed concrete tunnel, the Maastunnel

 Impact of corrosion on the first immersed concrete tunnel, the Maastunnel
Author(s):
Presented at IABSE Conference: Assessment, Upgrading and Refurbishment of Infrastructures, Rotterdam, The Netherlands, 6-8 May 2013, published in , pp. 544-545
DOI: 10.2749/222137813806521496
Price: € 25.00 incl. VAT for PDF document  
ADD TO CART
Download preview file (PDF) 0.48 MB

The structure of the first immersed concrete tunnel, the Maastunnel in Rotterdam is more than 75 years old and has always been serving well. Recently the tunnel was upgraded to fulfil the increased...
Read more

Bibliographic Details

Author(s):
Medium: conference paper
Language(s): English
Conference: IABSE Conference: Assessment, Upgrading and Refurbishment of Infrastructures, Rotterdam, The Netherlands, 6-8 May 2013
Published in:
Page(s): 544-545 Total no. of pages: 7
Page(s): 544-545
Total no. of pages: 7
Year: 2013
DOI: 10.2749/222137813806521496
Abstract:

The structure of the first immersed concrete tunnel, the Maastunnel in Rotterdam is more than 75 years old and has always been serving well. Recently the tunnel was upgraded to fulfil the increased traffic and fire safety requirements for tunnels. During those construction activities heavy corrosion of structural reinforcement has been observed.

This paper explains the damage that has been observed, the effects on the structural safety, the urgency and impact of the measures to be taken and the plan to refurbish in order to upgrade the tunnel for 50 more years.

This project actually shows the consequences when the technical lifetime of a major concrete structure in a main city has been exceeded. Since this is the first immersed concrete tunnel it shows what can be expected in the coming decades worldwide.

Keywords:
corrosion repair safety tunnel refurbish

Structures and Projects