0
  • DE
  • EN
  • FR
  • International Database and Gallery of Structures

Advertisement

High Level Engineering for Stay Cable Replacement

 High Level Engineering for Stay Cable Replacement
Author(s): , ,
Presented at IABSE Symposium: Sustainable Infrastructure - Environment Friendly, Safe and Resource Efficient, Bangkok, Thailand, 9-11 September 2009, published in , pp. 230-239
DOI: 10.2749/222137809796088224
Price: € 25.00 incl. VAT for PDF document  
ADD TO CART
Download preview file (PDF) 0.04 MB

This paper illustrates through Freyssinet experience that stay cable replacement works are highly technical works requiring specialised equipment, techniques and engineering at all stages of the op...
Read more

Bibliographic Details

Author(s):


Medium: conference paper
Language(s): English
Conference: IABSE Symposium: Sustainable Infrastructure - Environment Friendly, Safe and Resource Efficient, Bangkok, Thailand, 9-11 September 2009
Published in:
Page(s): 230-239 Total no. of pages: 8
Page(s): 230-239
Total no. of pages: 8
Year: 2009
DOI: 10.2749/222137809796088224
Abstract:

This paper illustrates through Freyssinet experience that stay cable replacement works are highly technical works requiring specialised equipment, techniques and engineering at all stages of the operation. Structural assessment and design, construction methods, work schedule and organisation are closely interconnected and need to be studied in a very coordinated manner by teams having experience in all of these fields. This is necessary to end with a technical solution that is durable according to modern standards, compatible with the structural capacity of the bridge, acceptable for the users in term of disturbance on the bridge operability.

Regarding these concerns, parallel strand cables offer significant advantages as they are highly durable, modular, and they require only light equipment and small space for being installed.

By extending the service life of bridges without traffic interruption, stay cable replacement operations respond perfectly to the rising demand for sustainable solutions permitting material and cost savings.

Keywords:
repair works Stay cable replacement parallel strand stay cables