0
  • DE
  • EN
  • FR
  • Internationale Datenbank und Galerie für Ingenieurbauwerke

Anzeige

High Level Engineering for Stay Cable Replacement

 High Level Engineering for Stay Cable Replacement
Autor(en): , ,
Beitrag für IABSE Symposium: Sustainable Infrastructure - Environment Friendly, Safe and Resource Efficient, Bangkok, Thailand, 9-11 September 2009, veröffentlicht in , S. 230-239
DOI: 10.2749/222137809796088224
Preis: € 25,00 inkl. MwSt. als PDF-Dokument  
ZUM EINKAUFSWAGEN HINZUFÜGEN
Vorschau herunterladen (PDF-Datei) 0.04 MB

This paper illustrates through Freyssinet experience that stay cable replacement works are highly technical works requiring specialised equipment, techniques and engineering at all stages of the op...
Weiterlesen

Bibliografische Angaben

Autor(en):


Medium: Tagungsbeitrag
Sprache(n): Englisch
Tagung: IABSE Symposium: Sustainable Infrastructure - Environment Friendly, Safe and Resource Efficient, Bangkok, Thailand, 9-11 September 2009
Veröffentlicht in:
Seite(n): 230-239 Anzahl der Seiten (im PDF): 8
Seite(n): 230-239
Anzahl der Seiten (im PDF): 8
Jahr: 2009
DOI: 10.2749/222137809796088224
Abstrakt:

This paper illustrates through Freyssinet experience that stay cable replacement works are highly technical works requiring specialised equipment, techniques and engineering at all stages of the operation. Structural assessment and design, construction methods, work schedule and organisation are closely interconnected and need to be studied in a very coordinated manner by teams having experience in all of these fields. This is necessary to end with a technical solution that is durable according to modern standards, compatible with the structural capacity of the bridge, acceptable for the users in term of disturbance on the bridge operability.

Regarding these concerns, parallel strand cables offer significant advantages as they are highly durable, modular, and they require only light equipment and small space for being installed.

By extending the service life of bridges without traffic interruption, stay cable replacement operations respond perfectly to the rising demand for sustainable solutions permitting material and cost savings.

Stichwörter:
Instandsetzungsmaßnahmen