From Bridges across Great Belt and Oresund towards a Femern Belt Bridge
|
Bibliographic Details
Author(s): |
Niels J. Gimsing
|
||||
---|---|---|---|---|---|
Medium: | conference paper | ||||
Language(s): | English | ||||
Conference: | IABSE Workshop: Recent Major Bridges, Shanghai, China, 11-12 May 2009 | ||||
Published in: | IABSE Workshop Shanghai 2009 | ||||
|
|||||
Page(s): | 63-77 | ||||
Total no. of pages: | 15 | ||||
Year: | 2009 | ||||
DOI: | 10.2749/222137809796089241 | ||||
Abstract: |
In Denmark the construction of three major bridges was initiated in the 1990s: Storebrelt Bridge (Great Belt Bridge), 0resund Bridge and Femem Belt Bridge. The first two were completed in 1998 and 2000, respectively, and the third is expected to be constructed during the second decade of the 21 st century. In both design and construction procedures a number of innovative features have been introduced. |
||||
Keywords: |
cable-stayed bridge box girder bridge wind tunnel test suspension bridge composite action
|