Effect of Short-Term Shrinkage on Deck Concrete of a Rail-Cum-Road Composite Truss Bridge

 Effect of Short-Term Shrinkage on Deck Concrete of a Rail-Cum-Road Composite Truss Bridge
Author(s): , , ,
Presented at IABSE Congress: Bridges and Structures: Connection, Integration and Harmonisation, Nanjing, People's Republic of China, 21-23 September 2022, published in , pp. 291-300
DOI: 10.2749/nanjing.2022.0291
Price: € 25.00 incl. VAT for PDF document  
ADD TO CART
Download preview file (PDF) 0.15 MB

Rail-cum-road truss bridges are rapidly developing, and frequent cracking in freshly poured deck concrete is of great concern. For the performance of such a load-bearing deck, it is necessary to un...
Read more

Bibliographic Details

Author(s): (Beijing University of Technology, Beijing, China)
(Beijing University of Technology, Beijing, China)
(Beijing University of Technology, Beijing, China)
(Taian High-tech Industrial Development Zone Management Committee, Taian, China)
Medium: conference paper
Language(s): English
Conference: IABSE Congress: Bridges and Structures: Connection, Integration and Harmonisation, Nanjing, People's Republic of China, 21-23 September 2022
Published in:
Page(s): 291-300 Total no. of pages: 10
Page(s): 291-300
Total no. of pages: 10
DOI: 10.2749/nanjing.2022.0291
Abstract:

Rail-cum-road truss bridges are rapidly developing, and frequent cracking in freshly poured deck concrete is of great concern. For the performance of such a load-bearing deck, it is necessary to understand its stress status due to short-term shrinkage. Taking a newly-constructed rail-cum-road truss bridge as the case project, this paper, by ANSYS finite element simulation, mainly analyzed the stress distribution in deck concrete under short-term action of shrinkage. Shrinkage of one deck panel and two companion specimens shortly after the concrete pouring was measured through in- situ testing. It was found that the free shrinkage of companion specimens at 40 days is 140~150 micro strains, significantly higher than that indicated by the current code. Under the action of short- term shrinkage, tensile shrinkage stress in the magnitude of 1,5~3,5 MPa is present in the deck, triggering potential cracking, and its effect shall therefore not be neglected.

Keywords:
composite bridge deck finite element simulation in-situ testing short-term shrinkage rail-cum-road bridge